Fitter measuring and marking a floor plank before cutting it to size

Floor Screeding in Ipswich: Levelling, Preparation and Repairs

We carry out floor screeding in Ipswich and east Suffolk, along with levelling, old floor removal, moisture treatment and subfloor repairs. Most flooring failures start underneath: lifting LVT, creaking laminate, cracked tiles, cupped wood.

  • Fitting only: buy your floor from any shop
  • Subfloor checked before we quote
  • Written, itemised quote
01473936738

Get a written quote

Where the floor is going, with the postcode.
Add more detail (optional)

We use your details only to respond to this enquiry. Privacy

Rendered illustration of a room with a levelled concrete floor

Why preparation affects the finished floor

A new floor copies whatever is beneath it. Thin floors such as sheet vinyl and glue-down LVT show every ridge. Click floors flex over hollows until the joints break. Wood reacts to moisture in the base. Adhesives fail on dusty, damp or contaminated surfaces. Manufacturers’ guarantees assume the subfloor was prepared to their instructions. Preparation is the part of the job you never see, and the part that decides how long the floor lasts.

Removing existing flooring

We uplift and dispose of carpet, underlay and gripper, laminate, vinyl, LVT, carpet tiles, and ceramic tiles where practical. Removal is normally part of a new flooring job and can also be booked alone, for example ahead of another trade.

Adhesive and residue removal

Old adhesive, bitumen and paint stop new adhesives and smoothing compounds from bonding. Residues are scraped or ground back to a sound surface, or sealed with a suitable primer where removal is not practical.

A caution on older floors

Thermoplastic tiles, some sheet vinyl backings and black bitumen adhesives fitted before 2000 can contain asbestos. If we suspect it, work stops until a sample is tested. Often these floors can be safely left in place and covered. We do not remove asbestos-containing materials.

Levelling with smoothing compound

Uneven concrete and screed are corrected with a smoothing compound, often called self-levelling compound or latex. The floor is cleaned and primed, then the compound is poured and trowelled to fill hollows and leave a smooth surface. It is a few millimetres thick in most rooms, with deeper fills where needed. It must cure before flooring goes down, from a few hours to a day or more depending on product and depth.

Smoothing compound makes a floor smooth and flat. It does not correct a floor that slopes significantly from one side to the other. That is a larger job, discussed after a survey.

  1. Your new floorOnly as good as the layers below
  2. Smoothing compoundFills hollows, leaves a flat surface
  3. PrimerSo the compound bonds
  4. Damp-proof membraneApplied when readings are high
  5. Concrete, old adhesive removedClean, sound and tested
A prepared concrete floor, ready for whatever goes on top.

Floor screeding

Screed is the sand-and-cement or liquid layer laid over a concrete slab or insulation to form the floor base, common in extensions, renovations and over underfloor heating pipes.

New screed holds a lot of water. A traditional sand-and-cement screed dries at roughly a millimetre a day in good conditions, and slower beyond 40 mm depth. Floors fitted too early fail. We test moisture before fitting, and can apply a surface damp-proof membrane where the programme cannot wait and the product allows it.

Moisture testing and damp-proof membranes

Every concrete or screed subfloor is tested before a moisture-sensitive floor goes down. Ground floors in older Suffolk houses often have no damp-proof membrane at all. Where readings are high, a liquid surface membrane is applied before the smoothing compound. Severe or rising damp needs its cause fixed first, and we will tell you if that is the case.

Preparing timber subfloors

  • Floorboards: loose boards are screwed down, damaged boards replaced and protruding fixings removed.
  • Plywood overlay: flooring-grade plywood, fixed at close centres, gives a smooth, stable base for LVT, vinyl and glued wood.
  • Chipboard: squeaks are fixed, swollen or water-damaged panels are cut out and replaced, and joints are sanded flush.
  • Ventilation: suspended timber floors need airflow beneath. We never seal them in a way that traps moisture.

Floor repairs

We repair floors as well as replace them: damaged or squeaking floorboards, failed chipboard panels, cracked or hollow patches of screed, lifting LVT planks, damaged laminate boards, split vinyl seams, loose thresholds and carpet that needs re-stretching. Whether a repair is sensible depends on matching the existing floor. If it will show, we say so before starting.

What each floor needs underneath

New floor Flatness needed Moisture sensitivity Typical preparation
Glue-down LVT Very high Medium Smoothing compound on concrete, plywood on boards
Click LVT and laminate High Medium to high Local filling and sanding, underlay with moisture barrier
Sheet vinyl and safety flooring Very high Medium Smoothing compound or plywood
Wood and herringbone Very high for glued blocks Very high Moisture test, membrane if needed, smoothing compound or plywood
Carpet Moderate Low Secure boards, fill large holes, new gripper and underlay

More detail

What affects the cost

  • Area
  • What has to be removed, and how well it is stuck
  • Depth of smoothing compound needed
  • Whether a damp-proof membrane is required
  • Plywood thickness and area
  • Extent of repairs
  • Waste disposal
  • Curing time, which can add a visit

Preparation is priced as its own line on every quote. Some of it cannot be known until the old floor is up. Where that applies, the quote gives a range and explains why.

Subfloor questions

Does my subfloor need levelling?

If a straight edge shows gaps, or the old floor has failed, probably. We measure at the survey.

Can you level a floor without fitting the new floor?

Yes. Tell whoever fits the floor which product was used.

How soon can flooring go on new screed?

When a moisture test says so. As a guide, allow at least a day per millimetre for traditional screed.

Can I fit over my old tiles instead of removing them?

Often, if they are sound. They are primed and skimmed with smoothing compound first, and the extra height is checked at doors.

Will levelling raise my floor?

Slightly, usually by a few millimetres. Plywood adds more. We check door clearances and thresholds.

Where do you work?

Across Ipswich and the nearby towns. For the fitting that follows, see flooring installation.

Tell us about your flooring project

Send us the rooms, approximate sizes and the floor you have in mind. We will come back to you to arrange a survey.

01473936738

Get a written quote

Where the floor is going, with the postcode.
Add more detail (optional)

We use your details only to respond to this enquiry. Privacy

01473936738Quote form